Cangzhou Zhongtie six million tons Iron and Steel Project |
||
|
Time:2011-07-01 10:36 Surce:Unknown Author:admin Hits:
|
||
This project's general contractor is Sinosteel MECC including all process before ironmaking. This project includes three 2500m3 blast furnace, three 150T converter, three 240m2 sintering, a two million tons pellet, four 6M ferric blast furnaces with 55 hole. The electrical general contractor is Beijing Bestpower Electrical Technology Ltd. (including electricity, instrument and automation). The specific content includes equipment supply, equipment design of automation system and on-site software programming & commission. The equipment and control level reaches the domestic first-class level. (Responsibility editor:demo) |
||
|
Previous article:4100mm Wide-plate Project of Chongqing Stell Plante
Next article:2460m blast furnace Turkey ISDENMIR steel plant |